Plumbing Price Book Template (Free)
A free flat-rate price book template for plumbing, and the hour-by-hour method to fill it with your own numbers.
Free. No sign-up, no email needed.

Ask plumbing shop owners about their price book and you'll hear the same thing: listing every task takes far longer than they expected, so it keeps getting pushed to next month. In the meantime, jobs get priced on the fly, and two techs can quote the same water heater swap two different ways.
This free plumbing price book template gives you the structure: the tabs, the columns, the formulas and a starter list of common plumbing tasks. What it doesn't give you is someone else's prices.
Every number in it comes from your own labor rate, your own supplier costs and your own margin. Below the download is the 5-step method to fill it in, with a worked example for each step.
It's built for plumbing businesses from one truck to ten, and it works in Google Sheets and Excel.
What's in the Plumbing Price Book Template
The plumbing pricebook template is one workbook with five tabs, and it works the same way in Google Sheets and Excel.
- Instructions: what each tab does, the five build steps in short, and how to import your finished book into your field service software.
- Company & Rates: your crew, wages, overhead, owner salary, margin and parts markup. This tab works out your break-even and recommended labor rate, and every price in the book is built from it.
- Price Book: one row per task, with estimated hours, material cost and markup. Labor, materials and your good, better and best prices are calculated for you. There's also a taxable column and an optional member price column if you sell maintenance plans.
- Starter Task List: more than 70 common plumbing tasks with suggested time ranges, grouped by category. Copy the ones you do into the Price Book tab.
- Printable Summary: a clean version of your book with task names, descriptions and prices only, ready to print or save as a PDF for your techs.
Every price cell starts blank, and that's on purpose. A price book only works if it's built from your costs, so the template gives you the structure and the math, and you bring the numbers.
| task_code | category | task_name | est_hours | materials_cost | price_good | price_better | price_best |
|---|---|---|---|---|---|---|---|
| PL-001 | Service call / diagnostic | Diagnostic service call | |||||
| PL-006 | Faucets & fixtures | Replace kitchen faucet | |||||
| PL-016 | Toilets | Replace toilet fill valve and flapper | |||||
| PL-024 | Water heaters | Replace tank water heater, 40 gal gas | |||||
| PL-036 | Drains & cleaning | Clear sink drain (cable) |
How to Build a Flat-Rate Plumbing Price Book in 5 Steps
Step 1: Know your true hourly cost
Every price in your book starts with one number: what an hour of a plumber's time actually costs you. Many owners can quote their hourly rate right away but can't say what an hour of tech time costs the business once everything is counted.
There are two rates to work out. Your break-even rate is what you need to charge per billable hour just to cover payroll, overhead and your own salary. Your recommended rate adds your profit margin on top.
To get there, you need:
- Wages plus burden: payroll tax, benefits and workers comp on top of base wages. The template starts at 20%.
- Billable share: the hours you actually bill, not the hours you pay for. Drive time, parts runs and callbacks don't get billed.
- Overhead: rent, trucks, insurance, software, office staff and marketing.
- Owner salary: what you pay yourself.
The template uses margin, not markup, for your labor rate. A 15% margin means you keep $15 of every $100 you charge.
Here's how it works for a shop with 5 plumbers at $35 an hour, 20% burden, 2,080 paid hours each with 1,500 of them billable (about 72%), $95,000 in overhead and a 15% margin:
- Loaded wage: $35 x 1.2 = $42.00 an hour
- Paid hours: 5 x 2,080 = 10,400. Billable hours: 5 x 1,500 = 7,500
- Payroll: 10,400 x $42 = $436,800
- Total cost: $436,800 + $95,000 = $531,800
- Break-even rate: $531,800 / 7,500 = $70.91
- Recommended rate at a 15% margin: $70.91 / 0.85 = $83.42
Owner salary is left at $0 here to keep the example simple. Add yours on the Company & Rates tab, since leaving it out makes every price in the book too low.
If you want to work through this number on its own first, our plumbing labor rate calculator walks you through it.
Step 2: List the 40 to 80 tasks you actually do
Pull your task list from the last 12 months of invoices and start with the jobs that come up most.
Most plumbing shops land somewhere between 40 and 80 tasks, spread across these categories:
- Service call and diagnostic
- Faucets and fixtures
- Toilets
- Water heaters (tank and tankless)
- Drains and cleaning
- Water lines and repipes
- Gas lines
- Sump and ejector pumps
- Water treatment
- Hose bibs and outdoor
The Starter Task List tab has more than 70 common plumbing tasks across these categories, each with a short description and a suggested time range. Copy the ones you do into the Price Book tab, skip the ones you don't, and add anything specific to your area.
Write each description in words a customer understands, because customers see it on the Printable Summary.
Step 3: Set task times honestly
Task time is where most flat-rate books go wrong, because the time in your head is usually the time with a wrench in hand. Count the whole job: setup, shutting off the water and draining down, cleanup, and the trip to the supply house if one is likely.
Water heaters and repipes are where times get underestimated most. A water heater swap you think of as a two-hour job often runs longer once you add the haul-away, the venting and bringing the install up to code. A repipe has access, patching coordination and testing on top of the pipe work.
Start from the suggested ranges in the Starter Task List, then sit down with your techs and ask how long each job really takes them. This is where tech buy-in starts. Techs who helped set the times are much more likely to trust the prices.
Set a minimum, too. A 15-minute job still has a truck roll in it. The template's minimum task price is half an hour at your recommended rate, which is $41.71 in the example above.
Step 4: Materials and markup
Use your own supplier costs, not list prices and not someone else's numbers. Owners who have bought a paid price book have found its material prices were nowhere near what they pay their supplier. Copper, PEX and water heater prices move often enough that a number from last year can already be wrong.
Keep markup and margin straight. Markup is added on top of your cost. Margin is the share of the selling price you keep. A 50% markup on a $30 part makes it $45, which is a 33% margin. The template uses markup for parts and lets you change it per task, so a water heater doesn't have to carry the same markup as a flapper. If you think in margin, our Parts Markup Calculator shows both for the same part.
Then check the taxable column. The template sets it to Y when a task includes materials and N when it doesn't. You can change it on any row if your state handles tax differently.
Step 5: Build good, better and best, and round your prices
Good, better and best gives the customer a choice instead of a yes or no. The tiers should differ by what's included, not just by price. For a running toilet:
- Good: replace the fill valve and flapper
- Better: fill valve, flapper and a new supply line
- Best: a full rebuild kit plus a warranty
The quick way to price the tiers is a spread over Good: Better at +20% and Best at +45%. Then round each price once, at the end, to the nearest $5 or to a $9 ending. Never round the labor rate itself.
The spread is a shortcut. If a better or best option adds parts that cost a lot more, check that the price still covers them.
Don't want to do this 60 times by hand? The Price Book Builder runs the same math on your whole task list and gives you a CSV you can paste straight into the Price Book tab.
Here's the toilet job priced with the example shop's numbers: 0.75 hours, $30 in parts, 50% markup, rounded to the nearest $5.
Common Plumbing Price Book Mistakes
Using someone else's prices
Owners who have been through it put it bluntly: running your shop on another company's price book is one of the fastest ways to lose money.
Their labor rate, their supplier, their area and their crew aren't yours. A borrowed book can look complete and still be wrong on every line. Build it from your own numbers.
Listing labor separately
The whole point of flat rate is one price for the job. If you show labor as its own line, the customer starts doing the math on your hourly rate and asking why a job took 90 minutes. Bundle labor and materials into one price per task and keep the hours in your own columns.
No update schedule
A price book is only right on the day you finish it. Supplier prices move, wages go up, a new truck adds to overhead, and the book stays the same. Without a set review date, most books go a year or more without a real update.
Put two things on the calendar: a full review every quarter, and a quick check of the affected rows whenever a supplier sends new pricing.
Techs don't buy in
Some owners who bought pre-built books say their techs never really used them. The fix is the same as for task times: involve your techs, and keep the book simple. A simple book gets used. A complicated one gets ignored, no matter how accurate it is.
Keeping Your Plumbing Price Book Current
Review the whole book once a quarter, and look at the affected rows any time a supplier sends a price change. Copper, PEX and water heaters move the fastest, so check those first.
Re-run your labor rate on the Company & Rates tab whenever your costs change: a raise, a new hire, a new truck, a jump in insurance. Every price in the book updates from that one tab, which is the main reason to keep the rate and the prices in the same workbook.
Before you change anything, save a dated copy of the old book. That way you can compare the two side by side and go back if a change doesn't hold up.
Building it once is the easy part. Keeping it current every time supplier prices move is the part nobody has time for. If you're done doing this by hand, we're building a way to change prices by just saying what changed. Apply for early access.
FAQs
What should be in a plumbing price book?
A plumbing pricebook lists every task you sell with one set price. Each row should have a task name, a customer-friendly description, estimated hours, material cost, and good, better and best prices. Add a taxable flag, and a member price if you sell maintenance plans. Behind the prices sit your labor rate, overhead, margin and markup, so you can update the whole book when your costs change.
Should plumbers charge flat rate or hourly?
Flat rate works better for most plumbing service calls. A homeowner with a running toilet or a leaking water heater wants to know the price before your tech starts, and a set price means nobody is watching the clock while the work gets done. Hourly still has a place on jobs you can't scope until the wall or floor is open, like tracing a hidden leak. A lot of plumbing shops run flat rate for service and repair and bid bigger jobs, like repipes, separately.
How often should I update my plumbing price book?
Do a full review every quarter, and update the affected tasks any time a supplier changes prices. Re-run your labor rate whenever wages, overhead or insurance change. Plumbing material costs, especially copper, PEX and water heaters, can move several times a year, so a book that hasn't been touched in a year is usually underpriced somewhere.
Can I import this into Housecall Pro, ServiceTitan or Jobber?
Yes. Export the Price Book tab as a CSV (File > Download > CSV in Google Sheets, or Save As > CSV in Excel), then map the columns when you import. Each software names its fields a little differently, so you'll match columns like task name, description and price to theirs during import. If you used the Price Book Builder, its CSV uses the same columns.
How many tasks should a plumbing price book have?
Enough to cover the calls you run every week, which for most plumbing shops means 40 to 80. Drains, toilets, faucets and water heaters usually make up the bulk of it. Gas lines, water treatment and repipes only belong in your book if you actually do that work. Price the jobs that show up on a year of invoices and add new ones as they come in. The Starter Task List tab has more than 70 to choose from.
What does good, better, best pricing mean?
It's three versions of the same job at three prices. On a water heater flush, good could be the flush itself, better could add a new anode rod, and best could add a new T&P relief valve and a warranty on top. Each tier should add something the customer can see, so the higher price makes sense to them. Your techs present all three on every call, and the customer picks.
Build the tools your trade needs.
Dalton Mills gives people in the trades the opportunity to create custom workflows and software tools without any prior technical experience.
Apply For Early Access